How Long Does a Whole-House Rewire Take?

Honest timelines — and what makes a job fast or slow.

☎ Call (301) 679-9193

Get a Free Estimate

Tell us about your project. Free estimates, no pressure.

Call or text now
(301) 679-9193
Serving Alexandria and Northern Virginia

Typical Timelines

For a typical Alexandria single-family home (1,500–2,500 square feet), a whole-house rewire usually takes 5 to 10 working days of on-site work. Smaller homes or condos can be done in 3–5 days. Large homes, homes with difficult access, or jobs that include a service upgrade can run two to three weeks. Add a few days on either end for permits and the final city inspection.

What Makes It Faster

What Slows It Down

Can You Stay in the House?

Usually, yes. The power goes off in sections as circuits are replaced — not the whole house for the whole job. Most families stay put. What you should expect: noise during work hours, some dust despite protection, and workers in and out of rooms on a schedule. If you work from home, plan around the noisiest days. For the panel swap day itself, the power is off for several hours — plan accordingly.

How Scheduling Works

A realistic schedule: inspection and written estimate (week 1), permit application (a few days), the rewire itself (1–2 weeks on site), city final inspection (a day or two after completion), then patching and touch-up. Ask any electrician for this timeline in writing before you sign — and ask what happens if they run long.

Day by Day: What a Typical Week Looks Like

Day 1: Protection goes up — floors, furniture, doorways. Panel area prepped. Attic and basement runs begin. Days 2–3: New circuits fished through walls; small openings cut and vacuumed as they go. Day 4: Devices go in — outlets, switches, fixtures. Old circuits disconnected in sections. Day 5: Panel swap (power off for hours — plan for it). Rough-in inspection scheduled. Days 6–7: Patching begins, final connections, cleanup. Following week: City final inspection, touch-up patching, walkthrough with you. Bigger homes stretch the middle days; smaller ones compress them.

What Can Go Wrong (and How It's Handled)

Honest talk: old houses surprise people. Buried junction boxes with no cover, abandoned live wires from a 1970s remodel, a panel location that violates current clearance code — we've seen it all. Here's our rule: we stop, show you, explain the options and the cost, and get your approval before proceeding. No surprise line items, no "we had to do it" bills. Most surprises add hours, not days, and a thorough inspection catches the big ones before day one.

Want a timeline for your house specifically? Call (301) 679-9193.

Frequently Asked Questions

Will I have power at night during the rewire?

Almost always yes. Circuits are replaced in sections, and the crew restores power to finished areas each evening. Only the panel-swap day means hours without power.

Does plaster patching add a lot of time?

Some — plaster patches need proper setting time between coats. A crew that plans for it builds it into the schedule rather than discovering it mid-job.

What if the job runs longer than quoted?

Ask up front how overruns are handled. Our written price covers the agreed scope; if we find something genuinely unexpected, we show you before proceeding — no surprise line items.

Is winter a bad time to rewire?

No — rewiring is indoor work. If anything, winter scheduling can be easier. The attic is the one hot spot, and it's cooler in winter.