Electrical Panel Upgrade Cost

The box in your basement decides what your whole house can do. Here's what upgrading costs.

☎ Call (301) 679-9193

Get a Free Estimate

Tell us about your project. Free estimates, no pressure.

Call or text now
(301) 679-9193
Serving Alexandria and Northern Virginia

What a Panel Upgrade Is

Your electrical panel is the gray metal box — usually in the basement, garage, or utility room — where power enters your home and splits into circuits. A panel upgrade replaces that box with a modern one: more capacity, safer breakers, room to grow. Most upgrades take a home from 60 or 100 amps to 200 amps.

Typical Cost Range

Published guides generally quote $1,500 to $4,000 for a standard panel upgrade in our area, with complex jobs (relocating the panel, upgrading the service line from the street, or heavy-up work) running higher. If the panel upgrade is part of a whole-house rewire, it is usually priced into the total job rather than billed separately.

Signs You Need One

Do You Need 200 Amps?

Not every home does. A small condo with gas heat may be fine at 100 amps. But if you are electrifying anything — EV charger, heat pump, induction cooking — or planning an addition or ADU, 200 amps gives you headroom. We size the panel to your actual loads, not to the biggest number we can sell you.

What's Included in the Price

A proper panel upgrade quote covers: the new panel and breakers, the service cable from the meter to the panel, grounding system updates (ground rods and water-pipe bonding, which old installs often lack), permit fees, the city inspection, and labeling every circuit clearly. If the quote is just "new panel" with a single price and no detail, ask what's missing — the grounding work alone is a common corner cut.

When the Power Company Gets Involved

Sometimes the panel isn't the only thing that's undersized — the overhead or underground service line from the street is too. Upgrading that line means coordinating with the power company: they disconnect service, we do our work, they reconnect and install the new meter. This adds days of scheduling but usually not much cost to you. We handle the coordination; you just need to know the power will be off for the better part of one day.

Permits and the Power Company

If the service line from the street also needs upgrading, the power company coordinates the disconnect and reconnect — we handle that scheduling. The power is off for part of one day, usually.

Not sure what you have? Call (301) 679-9193. We will look at your panel, tell you its age and capacity, and give you a written price — free.

Frequently Asked Questions

How long does a panel upgrade take?

Most take one day. The power is off for several hours while we swap the panel, then the city inspects. Complex jobs with service-line work can stretch to two days.

Can I upgrade the panel without rewiring the house?

Yes — they are separate jobs. But if your wiring is also old (knob-and-tube, aluminum), doing both together saves money versus two separate projects.

Are Federal Pacific panels really dangerous?

Their breakers have a documented failure to trip under overload — which is exactly what breakers are for. If you have one, replacement isn't optional in our view. We confirm the brand during inspection.

Will a new panel lower my insurance?

Sometimes. Insurers like modern panels and dislike fuse boxes and recalled brands. Ask your carrier — a panel upgrade occasionally earns a discount.

☎ Call (301) 679-9193